Data processing
Three areas of development
The ATC system processes the surveillance data and the flight plans, and both feed the user interface the controller works with (EQPS 001). Data processing has three major areas of development.
The surveillance tracker
Surveillance data processing: the tracker builds tracks from the plots the sensors report (EQPS 004). It has six jobs.
- Plot to track associationLinks a new plot to a track that already exists.
- Combines reports from different sensorsReports from different types of sensor feed the same tracks.
- Track smoothingUpdates the track with the latest plot.
- Estimates the current speed and headingOf the target, from its track.
- Track initiationStarts a new track from a plot that matches no existing track.
- Track maintenanceDeletes a track that is no longer updated, or predicts where it is from its last speed and heading.
Position indications and labels
What the controller sees on the display: the position indications, their labels, and the radar's vector line.
- PlotA position a sensor reports.
- TrackWhat the tracker builds from the plots (above).
- From any point
- Between two aircraft
Extended labels exist, with more. The leader line and the extended label: LAW 009.
Flight data processing and OLDI
Flight data processing, and OLDI, the information exchange that makes the coordination between ATC units automatic.
- No need for verbal transmissionsNo calls, and no handling by hand, for the boundary estimates.
- Timely acquisitionUpdated flight plan data arrives in time.
- Integrity of dataNo human error in passing it on.
- Accelerates the presentation of flight plan dataThe receiving controller sees it, with the call sign, sooner.
- If OLDI is down: work overloadThe estimates go back to voice, and the updates to the system by hand.
- Unfamiliar procedures
- Lack of staffTo pass the estimates and update the system by hand.
The OLDI messages
Six messages: four exchange the flight data automatically, and two, for the transfer of communication, are manual.
- ABI, Advance Boundary InformationAdvance notice of the flight to the next unit.
- ACT, activate messageThe coordination itself. It replaces the verbal estimate.
- REV, revision messageChanges data already sent in the ACT.
- LAM, logical acknowledgement messageThe automatic reply to each message.
- ROF, request on frequencyThe accepting unit asks for an early transfer of the flight.
- HOP, hand-over proposalProposes the flight for hand-over.
A flight about to cross from one area of responsibility (AoR) to the next, at the coordination point (COP). The two units' OLDI servers coordinate it.
The ACT does not activate the flight plan. It is the coordination, in place of the verbal estimate. A flight plan is activated by the DEP message (LAW 007).
Safety nets
Two kinds, by where they work: airborne safety nets alert the pilot, and ground-based safety nets alert the controller.
- ACASAirborne collision avoidance system, ICAO's name.
- TCASTraffic alert and collision avoidance system: the ACAS aircraft carry (ATM 006).
- GPWSGround proximity warning system.
- EGPWSEnhanced ground proximity warning system.
- TAWSTerrain avoidance and warning system.
- STCAShort term conflict alert.
- MSAWMinimum safe altitude warning.
- APWArea proximity warning.
- Not intended to replace ATC.
- The last defence.
- Their presence is ignored when sector capacity is calculated.
STCA, MSAW and APW
The three ground-based safety nets, and what each warns the controller of.
Two aircraft on converging tracks: STCA shows on both labels.
- Short term conflict alert
- Helps the controller prevent collisions between aircraftIt alerts to a potential or actual loss of separation.
- Sufficient warning timeUp to 2 minutes before separation is lost, where possible.
- False alertsKept to a minimum.
- Minimum safe altitude warning
- Alerts the controllerWhen an aircraft is, or will be, below the minimum safe altitude.
- Area proximity warning
- Warning timeUp to 2 minutes before.
- Warns about TRA and TSA, R, P and D areasWhen an aircraft is, or will be, flying into one (LAW 004).
- Also: a flight with no ABI
A fourth ground-based safety net, APM, approach path monitor, gives the same warning as MSAW on final approach (LAW 009).
Monitoring and planning tools
Two more kinds of ground tool: the monitoring aids, which show a flight leaving its route or its level, and the planning tools, which help the controller plan ahead.
- RAM, route adherence monitoringHighlights a flight leaving its planned route.
- CLAM, cleared level adherence monitoringHighlights a flight leaving its cleared level.
- FLEG, flight legProjects the aircraft's predicted path.
FLEG is the name in the course's system. - MTCD, medium term conflict detectionA controller support tool.
It searches for conflicts up to 20 minutes ahead.
It uses the trajectory to find conflicting paths. - AMAN, arrival managerOptimises the use of the runway, and the arrival traffic.
MTCD is a planning tool, not a safety net. It looks up to 20 minutes ahead; STCA up to 2.