Skip to content
LAW

Aviation LawLesson 6 of 11

LAW 006

Aeronautical information management

AIS and AIM

Who publishes aeronautical information, and what they provide.

The serviceAISAeronautical Information Service

The service itself: gathering aeronautical information and publishing it, in the products further down this note.

Paper products
The newer nameAIMAeronautical Information Management

The same job handled as data rather than as paper products, so it can pass straight between systems. The newer name, and the reason this lesson is called management.

Data
Where it comes from. AIS is regulated in ICAO Annex 15, Aeronautical Information Services. The annexes are in LAW 002.
The units
AIS headquartersICAO’s name for the central unit
What it covers
NOFInternational NOTAM Office
Related technical services
Cartography
Printing and distribution
AROAir traffic services reporting office

Most countries have scrapped theirs and run everything from one central unit instead.

That central unit has no international name24 hours, every day

Whatever it is called, it is staffed 24 hours a day, every day of the year. Nationally it goes by:

AIS/AICAeronautical information centreFPCflight planning centre“Briefing”common too

That AIC is a centre, not the Aeronautical Information Circular further down this note.

What AIS provides
Before the flightPre-flight briefing

Everything the crew needs before the flight.

After the flightPost-flight information

The service that lets pilots report what they met on the way: birds, and any navigation aid that was not working.

Pre-flight information

Getting briefed is the pilot’s own responsibility, not something done for them.

Responsibility of the pilot-in-command
Get the briefing

It is the pilot’s responsibility to obtain the pre-flight briefing.

Know what is out there

Before the flight, become familiar with all available information appropriate to the intended operation.

For flights away from the vicinity of an aerodrome, and for all IFR flights

Make a careful study of the four below.

WeatherCurrent reports and forecasts for the route, and for the aerodromes to be used.
FacilitiesWhat is available along the route to be followed, and the condition it is in.
AerodromesThe condition of the aerodromes to be used, and whether they suit the aircraft.
Rules and proceduresThe air traffic control rules and procedures for that particular flight.

SERA asks for two more. SERA.2010(b) requires the same careful study to take account of fuel requirements and an alternative course of action if the flight cannot be completed as planned. Both come from the regulation, not from the lesson notes.

What the briefing contains: three elements
Element 1AIS briefing

A careful study of the Integrated Aeronautical Information Package: the AIP, NOTAM, maps and charts. Broken down below.

Element 2Meteorological briefing

A careful study of the relevant METAR, TAF, SIGWX and the rest: forecast and actual weather for the route and for the aerodromes along it, and en-route the winds and temperatures at cruising level, cloud, turbulence and icing, shown on special charts.

Element 3Flight planning

Route selection, chart preparation, and preparing and submitting the flight plan. How it is filed is next.

Weather is MET’s work, not AIS’s. MET produces it, AIS makes it available and gives basic route guidance. For anything deeper the pilot is referred to the MET services.

Filing the flight plan

The same pipeline under both sets of rules, with a different office in the middle.

VFRIFR1Filled in byThe pilotThe pilot, the airline oran FPL service provider2SubmittedBy phone, fax orthe internetDigitally3Checked andcorrected byAISthe national unitIFPSrun by EUROCONTROL4Sent on to every ATS unit, and anyone else who needs itORM back to whoever filed itAccepted, or what is wrong with it.
VFR goes through AIS, IFR through IFPS. After that the two are the same.
IFPSIntegrated Initial Flight Plan Processing System

Run by EUROCONTROL, it takes every IFR flight plan for the airspace it covers, checks it, and passes it on.

ORMOperational Reply Message

The answer that goes back to whoever filed the plan: accepted, or what is wrong with it.

The Integrated Aeronautical Information Package

Everything AIS publishes, held together as one package.

IAIP: Integrated Aeronautical Information PackageAIPone per countryInformation of lastingcharacter, essentialto air navigationThese change the AIPAIP AMDTAIP AIRAC AMDTAIP SUPPermanent change,not operationally essentialPermanent change,operationally significantTemporary, from3 monthsPublished beside the AIPNOTAMShort durationor noticePIBIn plainlanguageAICOutside the AIPChecklists and lists of valid NOTAM: what is in force right now
Three publications change the AIP itself. NOTAM go out beside it, and are recapped for crews in the PIB.
PIBPre-flight Information Bulletin

The current NOTAM information of operational significance, put together before the flight. A recapitulation of the NOTAM in force and anything else of urgent character, in plain language for the crew.

Kinds of PIB
AerodromeOne aerodrome and its vicinity: the facilities, services and procedures there.
AreaA whole FIR, or an area inside one set by a centre point and radius or by a polygon, with the aerodromes in it.
RouteThe aerodromes and FIRs along a route.
Narrow RouteOnly a corridor along the route: departure and destination, significant points and airways, with a width and a level band. Can be built straight from the flight plan.
METTAF, METAR, SIGMET and the like for the chosen aerodrome, area or route.
All of them are built from the same messagesNOTAMSNOWTAMASHTAMBIRDTAMATFM
Checklists and summaries
On paperChecklists and summaries

Published so you can check you are holding the latest pages and the right messages. Updating an AIP by hand is easy to get wrong, and what is in it matters operationally.

Keep track by hand
EasierUse the internet

The eAIP is always current, and the AIS website lists the NOTAM in force, so there is nothing to keep track of by hand.

Nothing to keep track of

AIP

What is in it, and how the three parts are organised.

AIPAeronautical Information Publication

Information of lasting character, essential to air navigation. A manual with the regulations, procedures and other significant information for one particular country. Issued by, or with the authority of, the State.

The AIP is the bibleWhenever a country does something differently from SERA, that difference is published here.
Part 1
GENGeneral
  1. GEN 0Table of contents
  2. GEN 1National regulations and requirements
  3. GEN 2Tables and codes
  4. GEN 3Services
  5. GEN 4Charges for aerodromes and air navigation services
Part 2
ENREn-route
  1. ENR 0Table of contents
  2. ENR 1General rules and procedures
  3. ENR 2Air traffic services airspace
  4. ENR 3ATS routes
  5. ENR 4Radio navigation aids and systems
  6. ENR 5Navigation warnings
  7. ENR 6En-route charts
Part 3
ADAerodromes
  1. AD 0Table of contents
  2. AD 1Aerodromes: introduction
  3. AD 2Aerodromes
  4. AD 3Heliports

Every part starts at 0 with its own table of contents.

Which message type is used

The type depends on how permanent the change is and how important it is operationally.

A change to publishPermanentOperationally significant?TemporaryHow long does it last?noyes3 months +shortAIP AMDTpublication dateAIP AIRACAMDTAIRAC dateAIP SUP3 months or longerNOTAMshortShort notice overrides all of itA change that has to go out at short notice goes in a NOTAM, permanent or temporary.AICDoes not qualify for a NOTAM and does not belongin the AIP. Published outside it.
Two questions decide it. Short notice overrides both, and the AIC sits outside the four.
Light blue cover, in many countries
AIP AMDTAIP AmendmentPermanent

Permanent changes to the AIP, the ones that are not of essential operational importance. Issued when needed.

Validity
Permanent change
Takes effect
On the publication date shown on it.
Cover sheet
Light blue, in many countries.
Numbering
A consecutive serial number. The dates of publication and of effect are published, with a brief changelog.
Advance notice
No time limit.
Pink cover, in many countries
AIP AIRAC AMDTAIRAC AmendmentPermanent · significant

Operationally significant permanent changes, published on the AIRAC cycle.

Validity
Permanent change
Takes effect
On the AIRAC effective date shown on it, not on the day it is published.
Cover sheet
Pink, in many countries.
Examples
Changing ATS frequencies, changes to charts or to airspace.
Advance notice
42 days, or at least 56 for major changes. See below.
Yellow pages, recommended
AIP SUPAIP SupplementTemporary · 3 months +

Temporary changes of long duration, 3 months or longer, supplementing the permanent information in the AIP.

Also used for
Short-duration changes, when a lot of text or graphics has to be added to the permanent information.
Numbering
A consecutive serial number, counted by calendar year.
How long it stays
Kept in the AIP for as long as any of its contents are still valid.
Pages
ICAO recommends colouring them so they stand out, preferably yellow.
Replacing one
A new AIP SUP replaces the old one if an error is found in it, or if the period of validity changes.
Checklist
A checklist of valid AIP SUP is published.
A message, not a page
NOTAMTemporary · short

Issued promptly whenever the information is temporary and short. Also used when a change that would normally go in the AIP has to go out at short notice, whether it is a permanent change of operational significance or a temporary one of long duration.

Validity
Temporary and short, or short notice
Examples
Unserviceable ground equipment, SNOWTAM, ASHTAM, closed parts of aerodromes.
A circular
AICAeronautical Information CircularOutside the AIP

A notice about flight safety, air navigation, or technical, administrative and legislative matters. For information that does not qualify for a NOTAM and does not belong in the AIP.

Issued for
A long-term forecast of a major change in legislation, regulations, procedures or facilities. Or information that is purely explanatory or advisory and could affect flight safety.
Examples
Coming changes to air navigation procedures and services, new navigation systems, safety findings from accident investigations, medical advice for pilots, warnings about physical hazards, the rules on carrying restricted articles, licensing and training, a new edition of the AIP or a change to the NOTAM series, the snow plan.
Series
A: international and national. B: national only. The letters are a national convention, not an ICAO rule.

AMDT is the ICAO abbreviation for Amendment. The IAIP handout writes the same two messages as AIP AMD and AIP AIRAC AMD.

In Denmark there is no plain AMDT. AIP Denmark GEN 3.1 states that AIP Amendments are not published: the AIRAC AMDT carries what a plain AMDT carries elsewhere. Both types are on the course, so both are here, but the one you will meet is the AIRAC one.

Updating the AIP

AIRAC is Aeronautical Information Regulation And Control: a set of fixed dates for changes to take effect on, so everyone changes over on the same day.

Counted back from the day the change takes effectThe dashed lines are AIRAC dates. They fall every 28 days.effective dateNormal change · 42 days14 days post28 days: 1 AIRAC cyclesent outreceivedMajor change · 56 days56 days: 2 AIRAC cyclesreceived5642280Days before the effective date.Orange: the post. Blue: in the recipients’ hands.
A normal change is sent 42 days ahead so it is in the recipients' hands 28 days ahead. A major change has to be there 56 days ahead, two AIRAC cycles.
42 daysNormal changes go out 42 days before the effective date: 14 days of postal service, then 28 days, one AIRAC cycle, in the recipients' hands to update their systems.
56 daysMajor changes have to be in the recipients' hands at least 56 days before the effective date, which is two AIRAC cycles.
Trigger NOTAM

An AIRAC change is published weeks before it bites, so a crew reading only the pre-flight bulletin on the day would never see it land. The trigger NOTAM is what tells them.

published 42 or 56 days aheadAIP AMDT or SUPTrigger NOTAM in the PIBeffective date+14 days
The amendment is published 42 or 56 days ahead. The trigger NOTAM appears on the day it takes effect, and stays in the bulletin for 14 days after.
What it carriesA brief description of the contents, the effective date and time, and the reference number of the amendment or supplement.
When it comes into forceThe same effective date and time as the amendment or supplement it announces.
How long it stays14 days in the pre-flight information bulletin. If the supplement it announces is valid for less than that, only as long as the supplement.

Issued whenever an AIP AMDT or an AIP SUP is published under AIRAC. Its NOTAM Code ends in TT, which is how you pick one out of the Q line. From ICAO Annex 15 and PANS-AIM 6.1.4.7, not from the lesson notes.

Decoding a NOTAM

Series and numbering
A0024/13ASeries, one letter0024Four-digit number13Year of issue
The handout example, taken apart.

Every NOTAM belongs to a series, identified by one letter, such as A, B, M or S. Then a four-digit number, a slash, and the year of issue. Each series starts again at 0001 on 1 January.

What it does to the NOTAM before it
N
NewA new NOTAM
R
ReplaceReplaces a previous NOTAM
C
CancelCancels a previous NOTAM

Try it

The handout example. Click a part of the message, or a group below it, to see what it means.

(A0024/13Message envelope
Series, number and year
Series A, number 0024, issued in 2013

One letter for the series, then a four-digit number, a slash and the year of issue. Each series starts again at 0001 on 1 January. Which series exist, and what each is used for, is decided nationally and published in the AIP.

Two real ones. The first is the Entry Point North handout example, a Norwegian danger area. The second is a temporary restricted area over Malmö: no Q line, a schedule that runs through midnight, and limits in feet rather than a flight level.

SNOWTAM

The first of two special series NOTAM met in passing earlier in this note, now in full.

SNOWTAMSpecial series NOTAM on snow, ice, slush or standing water

Reports snow, ice, and, where there is enough of it, standing water on the movement area. Published daily while conditions call for it.

Worked example

SNOWTAM 0151, for EKCH: three runways in the same report, each inspected in turn.

SNOWTAM 0151
EKCH 02170055 04L 5/5/5 100/100/100 NR/NR/NR WET/WET/WET
EKCH 02170135 04R 5/4/3 100/50/75 NR/06/06 WET/SLUSH/SLUSH
EKCH 02170225 12 3/2/1 75/100/100 06/12/12 SLUSH/WET SNOW/WET SNOW
RWY 04L SNOWBANK R20 FM CL. RWY 04R ADJ SNOWBANK TWY B POOR APRON NORTH POOR)
Good across the board
Runway 04L17 Feb, 00:55

The best of the three: every third comes back at RWYCC 5.

RWYCC
5 / 5 / 5
Coverage
100% / 100% / 100%
Depth
NR / NR / NR
Contaminant
Wet / wet / wet
Falls off in the final third
Runway 04R17 Feb, 01:35

RWYCC drops from 5 to 3 as the thirds go on.

RWYCC
5 / 4 / 3
Coverage
100% / 50% / 75%
Depth
NR / 6 mm / 6 mm
Contaminant
Wet / slush / slush
Worst of the three
Runway 1217 Feb, 02:25

RWYCC 1 in the final third, the poorest reading in the whole report.

RWYCC
3 / 2 / 1
Coverage
75% / 100% / 100%
Depth
6 mm / 12 mm / 12 mm
Contaminant
Slush / wet snow / wet snow

Each runway is split into three equal thirds, first third to third third. RWYCC is the runway condition code for that third, NR means not reported. A SNOWTAM also reports snow banks where they narrow a runway, taxiway or apron: this example noted one alongside runway 04L, marked “R20” from the centreline, an adjacent one by runway 04R, and poor braking action on taxiway B and the north apron.

ASHTAM

The second of the two, built the same way but read by its colour code.

ASHTAMSpecial series NOTAM on volcanic activity

Uses an ICAO colour code to signal the activity. Structured like a NOTAM, in lettered items.

Worked example

Issued as VALI0021, from LIRR, on 01 09 at 14:10.

(VALI0021 LIRR 01091410
ASHTAM 005/10
A) ROMA FIR
B) 01091350
C) ETNA 101-06
D) 3744N01500E
E) RED ALERT
F) AREA AFFECTED 3700N01500E 3900N01600E SFC/35000 ft
G) NE
H) ROUTES AFFECTED WILL BE NOTIFIED BY ATC
J) VULCANOLOGICAL AGENCY
Roma FIR
ASHTAM 005/10Mount EtnaRED ALERT

The lettered items, A to H and J. Item I, closure of airspace or routes, is absent because nothing was closed.

A) FIR
Roma FIR
B) Observed
01 09, 13:50
C) Volcano
Etna, number 101-06
D) Position
37°44′N 015°00′E
E) Colour code
Red alert
F) Area affected
37°00′N 015°00′E to 39°00′N 016°00′E, surface to 35 000 ft
G) Movement
Moving north-east
H) Routes
Routes affected will be notified by ATC
J) Agency
Volcanological agency

F to I are the items only present when needed. This one carries F, G and H, and no I, because no airspace or route was closed. J, the source of the information, is always given, whether or not there has been an eruption. A K item can follow it, for plain-language remarks. Items I and K are from ICAO Annex 15, not from the lesson notes.

The aeronautical fixed network

The telecommunications system AIS and the rest of the network run on.

AFSAeronautical Fixed Service
Three networks
AFTNAeronautical Fixed Telecommunication Network
CIDINCommon ICAO Data Interchange Network
AMHSATS Message Handling System

Reading material