Skip to content
ATM

Air Traffic ManagementLesson 7 of 9

ATM 007

Airspace management

The levels

What ASM is

ASM, airspace management, is one of the three parts of ATM, with ATFCM and ATS (ATM 001).

Airspace managementA planning function that makes the best use of the available airspace, by sharing it in time between users and, at times, keeping parts of it for one group, on short-term needs.
Flexible use of airspace

FUA, flexible use of airspace, is how the Single European Sky, SES, does ASM. Airspace is not purely civil or purely military, but one continuum, used flexibly day by day. Its four principles:

Coordination between civil and military
Consistency between ASM, ATFM and ATS
Temporary airspace reservation
Applied across national borders

ATFM, air traffic flow management, is the next lesson: ATM 008.

The three ASM levels

ASM works at three levels, each nearer the day of operations. D is that day: D-1 is the day before.

  1. Level 1StrategicD-7 and earlierEstablishment of national airspace policy and structureA joint civil and military task
  2. Level 2Pre-tacticalD-6 to D-1Day-to-day allocation of airspaceThe airspace management cell
  3. Level 3TacticalThe day itselfReal-time use of airspaceCivil and military ATS units
Level 1 sets up the structure, level 2 allocates it for each day, level 3 uses it in real time.

Strategic ASM, level 1

Level 1 sets up the airspace in four steps, in this order.

  1. Collection and validation
  2. Coordination and conciliation
  3. Design and validation
  4. Publication and implementation
What it designs
Airspace and routes

Shared airspace

Level 1 designs three kinds of shared airspace. Each is reserved for a time only.

  • TSATemporary segregated area
    Segregated

    Non-participating aircraft may not cross it.

  • TRATemporary reserved airspace
    Reserved

    Other traffic may cross it with an ATC clearance.

  • CBACross-border area
    Cross-border

    A TSA or TRA that covers two or more states.

A TRA is reserved, not restricted. A restricted area, an R-area, is another kind of special area.

All three beside the P-, R- and D-areas: LAW 004.

Conditional routes

CDRs, conditional routes, are set up at level 1 too. They come in three categories (LAW 004).

  • CDR 1Permanently plannable
    • Plannable during the times published in the AIP.
    • Expected to be mostly available.
    • Planned like a permanent ATS route.
    • If it becomes unavailable at short notice, ATC re-routes the flight.
  • CDR 2Non-permanently plannable
    • Allocated day by day, to respond to an imbalance between traffic and ATC capacity.
    • Plannable only by the daily AUP or EAUP, the airspace use plan.
    • Part of pre-defined routing scenarios.
  • CDR 3Not plannable
    • Used on ATC instruction only.
    • A short-notice routing.

SCC, the single CDR category, is Europe’s aim to keep only CDR 1. It is now largely in place: AIP Denmark lists only CDR 1 routes.

Day by day

Pre-tactical and tactical ASM

Levels 2 and 3 side by side: the plan for each day, then its use in real time.

Level 2Pre-tactical ASM
D-6 to D-1

The airspace management cellAMC

  • Civil and military daily allocation
  • Flexible airspace structuresSuch as the shared airspace and the conditional routes.
  • AUP, the airspace use planPublished by the airspace management cell. Each national AUP is shared at European level, in the EAUP, the European airspace use plan.
Level 3Tactical ASM
The day itself

Civil and military ATS units

  • Real-time use of airspace
  • Activation, deactivation and reallocation of airspace
  • Resolution of airspace problems and traffic situations

Collaborative decision making

ASM, ATS and flow management work on one loop, and the partners decide together: CDM, collaborative decision making.

TrafficdemandAirspace andATS routesATC capacityASMATSFlow managementCDM
ASM links traffic demand to the airspace and ATS routes, ATS links those to ATC capacity, and flow management works between traffic demand and ATC capacity.

Flow management: ATM 008.

Reading material